White Construction built the Sleeping Bear Wind Farm located in Harper County, Oklahoma just north of Woodward.  The project was located on rural farm ground and required installation of numerous cattle guards in order to protect farmer’s livestock in the surrounding area.  The project also required coordination with multiple gas pipeline companies in order to safely crawl erection cranes as well as installation of the underground collection system.

PROJECT SCOPE OF WORK

  • Construction of all access roads
  • Modify / Upgrade existing county roads
  • Design and build all foundations
  • Turbine erection

CONSTRUCTION PHOTOS

PROJECT DETAILS

Categories:
Client: Edison Mission Energy
Location: Oklahoma
Megawatts: 94.5 MW
Completed: 2007

Connect

CONTACT

3900 E. White Ave P.O. Box 249, Clinton, IN 47842

(800) 355-9401

info@whiteconstruction.com

(765) 832-2075

Mon – Fri: 8:00 – 5:00

Ready to power forward your next project?