The Marsh Hill Solar Farm is located in Scugog, Ontario, Canada.  The project was reassigned to H.B. White Canada Corporation after a previous EPC Contractor could not meet price and schedule requirements.  The project was constructed around a major archaeological site which required special care to ensure the site was protected.  Additionally the project required a specialized foundation design to address unique geotechnical conditions on the project site.

PROJECT SCOPE OF WORK

  • Engineering
  • Permitting
  • Clearing / Grading
  • SWPPP
  • Permanent site fence
  • Access roads
  • Foundation design supply & installation
  • Rack supply & installation
  • Module installation
  • Electrical BOS
  • Fiber optic supply & install for SCADA
  • Permanent security supply & install
  • Met stations supply & installation
  • Substation design & installation
  • Testing & commissioning

CONSTRUCTION PHOTOS

PROJECT DETAILS

Categories:
Client: Sun Edison
Location: Ontario, Canada
Megawatts: 10 MW
Completed: 2015

Connect

CONTACT

3900 E. White Ave P.O. Box 249, Clinton, IN 47842

(800) 355-9401

info@whiteconstruction.com

(765) 832-2075

Mon – Fri: 8:00 – 5:00

Ready to power forward your next project?