PROJECT SCOPE OF WORK

  • Assembly & erection of 33 tubular steel transmission structures
  • Site restoration around the erection areas
  • 550 ton crane required to set the structures
  • Due to unusually soft ground conditions, timber matting was required to move the cranes on site

CONSTRUCTION PHOTOS

PROJECT DETAILS

Categories:
Client: SNC Lavlin
Location: Alberta, Canada
Completed: 2013

Connect

CONTACT

3900 E. White Ave P.O. Box 249, Clinton, IN 47842

(800) 355-9401

info@whiteconstruction.com

(765) 832-2075

Mon – Fri: 8:00 – 5:00

Ready to power forward your next project?