The East Lake St. Clair wind project required pile driven foundations due to poor soil conditions.  Additionally due to agricultural restrictions the cranes could not be walked from site to site for turbine erection.  Thus resulted in 46 individual crane tear downs to erect 55 turbines on site.  The project despite wet weather conditions and over 49 wind days during erection sequencing was completed on time.

PROJECT SCOPE OF WORK

  • Construction of all access roads
  • Modify / Upgrade existing county roads
  • Design and build all foundations
  • Design and build substation
  • Installation of collection systems
  • Turbine erection
  • Site restoration

CONSTRUCTION PHOTOS

PROJECT DETAILS

Categories:
Client: East Lake St. Clair Wind Farm
Location: Chatham & Kent counties, Ontario Canada
Megawatts: 99 MW
Completed: 2013

Connect

CONTACT

3900 E. White Ave P.O. Box 249, Clinton, IN 47842

(800) 355-9401

info@whiteconstruction.com

(765) 832-2075

Mon – Fri: 8:00 – 5:00

Ready to power forward your next project?